Abdelkader, E M, Moselhi, O, Marzouk, M and Zayed, T (2021) Integrative Evolutionary-Based Method for Modeling and Optimizing Budget Assignment of Bridge Maintenance Priorities. Journal of Construction Engineering and Management, 147(09).

Ahmed, A, Mohammed, H A, Gambatese, J and Hurwitz, D (2021) Effects of Flashing Blue Lights Mounted on Paving Equipment on Vehicle Speed Behavior in Work Zones. Journal of Construction Engineering and Management, 147(09).

Cai, Q, Hu, Q and Ma, G (2021) Improved Hybrid Reasoning Approach to Safety Risk Perception under Uncertainty for Mountain Tunnel Construction. Journal of Construction Engineering and Management, 147(09).

Chen, B, Yu, X, Dong, F, Zheng, C, Ding, G and Wu, W (2021) Compaction Quality Evaluation of Asphalt Pavement Based on Intelligent Compaction Technology. Journal of Construction Engineering and Management, 147(09).

Hajj, C E, Jawad, D and Montes, G M (2021) Analysis of a Construction Innovative Solution from the Perspective of an Information System Theory. Journal of Construction Engineering and Management, 147(09).

Hasan, A, Rameezdeen, R, Baroudi, B and Ahn, S (2021) Mobile ICT–Induced Informal Work in the Construction Industry: Boundary Management Approaches and Consequences. Journal of Construction Engineering and Management, 147(09).

Hassan, F u, Le, T and Lv, X (2021) Addressing Legal and Contractual Matters in Construction Using Natural Language Processing: A Critical Review. Journal of Construction Engineering and Management, 147(09).

Huang, H, Zhang, C and Hammad, A (2021) Effective Scanning Range Estimation for Using TLS in Construction Projects. Journal of Construction Engineering and Management, 147(09).

Jiang, Y and Bai, Y (2021) Low–High Orthoimage Pairs-Based 3D Reconstruction for Elevation Determination Using Drone. Journal of Construction Engineering and Management, 147(09).

Johannes, K, Theodorus Voordijk, J, Marias Adriaanse, A and Aranda-Mena, G (2021) Identifying Maturity Dimensions for Smart Maintenance Management of Constructed Assets: A Multiple Case Study. Journal of Construction Engineering and Management, 147(09).

Kar, S and Jha, K N (2021) Exploring the Critical Barriers to and Enablers of Sustainable Material Management Practices in the Construction Industry. Journal of Construction Engineering and Management, 147(09).

Noghabaei, M, Han, K and Albert, A (2021) Feasibility Study to Identify Brain Activity and Eye-Tracking Features for Assessing Hazard Recognition Using Consumer-Grade Wearables in an Immersive Virtual Environment. Journal of Construction Engineering and Management, 147(09).

Perez-Perez, Y, Golparvar-Fard, M and El-Rayes, K (2021) Scan2BIM-NET: Deep Learning Method for Segmentation of Point Clouds for Scan-to-BIM. Journal of Construction Engineering and Management, 147(09).

Raoufi, M and Fayek, A R (2021) How to Improve Crew Motivation and Performance on Construction Sites. Journal of Construction Engineering and Management, 147(09).

Taghizadeh, K, Alizadeh, M and Yavari Roushan, T (2021) Cooperative Game Theory Solution to Design Liability Assignment Issues in BIM Projects. Journal of Construction Engineering and Management, 147(09).

  • Type: Journal Article
  • Keywords: Building information modeling (BIM); Disputes; Liability; Game theory; Cooperative games; Core; Shapely value;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0002117
  • Abstract:
    In building information modeling (BIM) projects, more interactions between parties and more data input to the model lead to changes in roles and design processes, which require redefining parties’ responsibilities for design. The authors could hardly find solutions to this design liability assignment issue in neither previous studies, contractual standards, nor the contracts of BIM projects. Hence, we utilized cooperative game theory, particularly the liability game model, to analyze the issue. Using Core and Shapley value, different project conditions were compared based on five scenarios and parameters affecting parties’ shares of the damage. Both methods resulted in optimistic choices in all the scenarios. Findings were as follows: in all scenarios, the team that caused the first damage holds the biggest share, an increase in players’ weights will increase their share, and generally, all the parameters have more effect on the first player than on the others. The paper also analyzes a case study. Research results can result in better risk allocation and consequently less uncertainty in BIM projects, manipulating entrepreneurs into using BIM, and reaching a more productive industry.

Votto, R, Lee Ho, L and Berssaneti, F (2021) Earned Duration Management Control Charts: Role of Control Limit Width Definition for Construction Project Duration Monitoring. Journal of Construction Engineering and Management, 147(09).

Xu, Y, Shen, X, Lim, S and Li, X (2021) Three-Dimensional Object Detection with Deep Neural Networks for Automatic As-Built Reconstruction. Journal of Construction Engineering and Management, 147(09).